Emsworth Strategic Project Emsworth sign

 


 

 

The aim of the liveability project for Emsworth is to make improvements to crossing the A259 and reducing the effects that the road has on the community.

 
Progress
See below for progress on various elements of the Emsworth Liveability Projects' progress
 

Roundabout A259

Before Liveability works Emsworth roundabout After Liveability works Emsworth roundabout
Before After
All works completed
Improvement of island in North Street

 

Subway

 

Subway art work Emsworth

Subway art work Emsworth
Artwork for the subway are all now printed at full size and laminated, installation to start 31/07/06 and will take approximately 3 weeks.
 
Subway steps before-Emsworth Subway steps after-Emsworth

 

Steps on path replaced with an anti slip ramp to facilitate disabled access
Brickwork repairs complete
All brickwork has been cleaned
All funded by HCC
Mirrors installed
New handrails in place – some quality issues to be resolved
New drainage channels installed

 

Railings

Erected quality problems currently being resolved by contractor
Plaques have been delivered will be fixed to the railings once problems have been resolved should be complete by end of August.
3 lighting columns installed still to be connected
Emsworth sign

 

Footpath to Brook Meadow

Brook Meadow Bridge before Anti-slip on bridge Brook Meadow
Before After
Initial section of path completed and wire netting has been removed
Anti-slip on bridge and treatment of woodwork complete
Improved signage to car park
 
 

Improvements to crossing North Street

Improvement of island in North Street before Improvement of island in North Street after
Before After
The crossing was widened to provide a safe refuge in the centre of the road, with additional tactile paving to aid partially sighted pedestrians. Drop kerbs were re-aligned to provide a straight crossing point.
 

Vehicle & pedestrian signage

Audit of existing completed
Design and install by end September
Lighting on A259
Order placed in June but 12 week minimum before installed
Note: Some damage to subway wall and railings following a road accident, HCC to fund repairs which will be carried out shortly.
 

Budget

Current spend Actual/Commitments £188, 000, with the small amount of additional work left, anticipated that the final spend will be close to the allocated £200,000.
 

History

 
The main features of the Liveability Project in Emsworth were identified as:
  • Improvements to the North Street Subway
  • Link from the subway to the car park
  • Improvements to crossing North Street
  • Improvements on the A259
  • Link to Brook Meadow
  • Treatment of the wooden bridge/walkway
Emsworth map

Information and photos on this page courtesy Havant Borough Council

 

 

 
 